{"id":689,"date":"2026-10-22T16:49:35","date_gmt":"2026-10-22T08:49:35","guid":{"rendered":"https:\/\/www.aimoli2016.cn\/?p=689"},"modified":"2026-10-22T16:49:37","modified_gmt":"2026-10-22T08:49:37","slug":"groundwater-sampling-system-case-study","status":"publish","type":"post","link":"http:\/\/www.aimoli2016.cn\/?p=689","title":{"rendered":"Groundwater Sampling System Case Study"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\">AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">During the National Day holiday, <a href=\"https:\/\/www.aimoli2016.cn\/?p=129\">AIMOLI (Hebei) Technology Co., Ltd.<\/a> received an equipment inquiry from Mr. Ma in Henan. Mr. Ma&#8217;s organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the project was commissioned by a government entity, it was subject to relatively stringent requirements regarding fieldwork procedures, equipment configuration, and data traceability. The client wanted to finalize a groundwater sampling and monitoring equipment solution that met the project&#8217;s requirements as soon as possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following discussions, product presentations, and an on-site equipment inspection, the client approved the proposed equipment configuration from AIMOLI. The two parties signed the purchase contract on the third day of the National Day holiday and coordinated equipment dispatch on the fourth day, helping the client make progress toward the project&#8217;s subsequent implementation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Project Background: Groundwater Purging and Sampling Across 20 Wells Required Higher Equipment Standards<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The third-party testing center where Mr. Ma works had undertaken a groundwater well purging and sampling project involving 20 wells. According to the project requirements, the equipment needed not only to meet the relevant national and industry technical specifications but also to support well purging, sampling, and on-site monitoring. It also needed to support the required data traceability and operation records.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As the project was commissioned by a government entity, standardized fieldwork and process management were particularly important. How to improve on-site work efficiency and standardize well purging and sampling procedures while maintaining sampling quality became a key consideration in the client&#8217;s equipment purchasing decision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. What Problems Can Traditional Bailer Sampling Present?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">According to Mr. Ma, the project team had previously relied primarily on traditional bailers for groundwater sampling, while well purging was often carried out using relatively simple methods. For a project involving 20 wells, this approach presented challenges in staffing, field operations, and sampling procedure standardization.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Relatively Low Fieldwork Efficiency<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Traditional bailer sampling typically requires workers to lower and retrieve the sampling tube repeatedly. Based on the client&#8217;s previous experience, routine field sampling required three to four workers to work together. This involved considerable personnel input and a relatively complicated workflow.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Limited Water Volume per Sampling Cycle<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Taking the 1,000 mL bailer previously used by the client as an example, the bailer fills with water when lowered into contact with the water body. A small amount of leakage may occur during retrieval, resulting in an actual water sample volume of approximately 700\u2013800 mL per sampling cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The actual sample volume may vary depending on the equipment specifications, operating method, and site conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Potential Limitations in Sample Representativeness<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In certain applications, traditional bailer sampling may make it difficult to obtain water samples precisely from a target groundwater layer. For groundwater monitoring projects that focus on the water quality of a specific layer, equipment selection and sampling methods should be determined based on well construction, monitoring objectives, and applicable technical specifications.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Considerable Workload for Well Purging<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When traditional bailers are used for well purging, repeated lowering and retrieval operations can result in a substantial fieldwork burden. Without suitable equipment and standardized operating procedures, both work efficiency and process management for well purging and sampling may be affected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For third-party testing institutions handling multiple wells, stringent quality control requirements, and defined project schedules, selecting appropriate groundwater sampling equipment can help improve fieldwork procedures and enhance the standardization of project execution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. AIMOLI&#8217;s Groundwater Sampling and Monitoring Equipment Solution<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">After learning about the client&#8217;s project requirements, AIMOLI&#8217;s staff communicated with Mr. Ma and invited him to inspect the equipment in person. As the client wanted to finalize the purchasing plan promptly, AIMOLI arranged a visit on the third day of the National Day holiday, providing equipment explanations and physical demonstrations tailored to the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the visit, the client focused on the following three products:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. AML 918 Groundwater Sampling Pump<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.aimoli2016.cn\/?p=57\">AML 918 Groundwater Sampling Pump<\/a> is primarily used for groundwater sampling operations. Equipment selection should be evaluated in accordance with sampling depth, well conditions, target water samples, and project technical requirements to ensure suitability for the specific field sampling task.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. AML 913 Groundwater Level Meter<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.aimoli2016.cn\/?p=67\">AML 913 Groundwater Level Meter<\/a> is used to measure groundwater levels and can be used in groundwater monitoring activities. In practical applications, the appropriate configuration should be selected based on field measurement requirements and the equipment&#8217;s technical specifications.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. AML 916 Groundwater 6-Parameter Meter<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.aimoli2016.cn\/?p=60\">AML 916 Groundwater 6-Parameter Meter<\/a> is designed for on-site multi-parameter groundwater measurement and can provide relevant data support for field monitoring. The specific parameters measured, measurement ranges, and technical specifications should be confirmed against the official product documentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through detailed explanations of equipment functions, applicable scenarios, and project configuration, the client gained a better understanding of how groundwater sampling equipment, groundwater level measurement instruments, and on-site multi-parameter monitoring instruments can work together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Based on the requirements discussed for this project, <a href=\"https:\/\/www.aimoli2016.cn\/\">AIMOLI<\/a> provided a corresponding equipment configuration proposal. The proposed equipment solution was reviewed against the relevant technical specifications, including HJ 164 and HJ 1019, as requested by the client. The specific applicable provisions and equipment compliance should be confirmed through official technical documentation and the project&#8217;s requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. From Holiday Inquiry to Contract Signing: Accelerating Equipment Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As the client&#8217;s organization continued normal business operations during the National Day holiday, its staff were also conducting sampling and monitoring work in the field. The client therefore hoped to complete the equipment inspection and purchasing plan as soon as possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After receiving the inquiry, AIMOLI promptly arranged a visit and scheduled Mr. Ma&#8217;s inspection for the third day of the National Day holiday. During the visit, staff explained the equipment in detail and provided the opportunity to inspect the physical products.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following discussions and the on-site inspection, Mr. Ma and the accompanying sampling technicians expressed their approval of the proposed equipment configuration and proceeded to confirm their purchasing intention and inquire about the delivery schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At that time, the standard delivery lead time for the relevant equipment was approximately three to four weeks. Considering the project&#8217;s tight schedule, AIMOLI coordinated its other non-urgent orders and prioritized preparation and delivery arrangements for this order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The two parties signed the purchase contract on the third day of the National Day holiday. On the fourth day, AIMOLI coordinated its production and shipping personnel to complete equipment dispatch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From the initial inquiry to the on-site inspection, solution confirmation, contract signing, and equipment dispatch, both parties maintained active communication around the project&#8217;s requirements and delivery schedule, helping move the procurement process forward efficiently.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Why Should Third-Party Testing Institutions Pay Attention to Groundwater Sampling Equipment Selection?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For third-party testing institutions, groundwater sampling equipment affects not only fieldwork efficiency but also the suitability of sampling methods, sample representativeness, on-site monitoring data, and project quality control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When selecting a groundwater sampling system, the following factors should be considered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Project suitability:<\/strong> Select appropriate equipment based on groundwater well depth, well construction, target water layers, and sampling tasks.<\/li>\n\n\n\n<li><strong>Well purging and sampling procedures:<\/strong> Evaluate the equipment configuration required for well purging, sampling, and on-site monitoring according to project requirements.<\/li>\n\n\n\n<li><strong>Standards and quality control:<\/strong> Verify the technical specifications applicable to the project, equipment documentation, and fieldwork requirements.<\/li>\n\n\n\n<li><strong>Data recording and traceability:<\/strong> Confirm whether the equipment, monitoring instruments, and supporting software can provide the data recording, export, and traceability functions required by the project.<\/li>\n\n\n\n<li><strong>Delivery lead time and technical support:<\/strong> For projects with fixed mobilization dates, confirm equipment availability, delivery schedules, and after-sales support in advance.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A suitable equipment configuration can help third-party testing institutions organize fieldwork more effectively. The final solution should still be determined according to project technical requirements, equipment performance, and applicable specifications.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Frequently Asked Questions (FAQ) About AIMOLI Groundwater Sampling Equipment<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. What Equipment Is Typically Included in a Groundwater Sampling System?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on project requirements, a groundwater sampling system may include a groundwater sampling pump, groundwater level meter, groundwater multi-parameter meter, and related accessories. The specific configuration should be determined based on well depth, sampling requirements, field monitoring parameters, and applicable technical specifications. Not every project requires the same combination of equipment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. What Is the Difference Between a Groundwater Sampling Pump and a Bailer?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A bailer typically collects water through a process of lowering, filling, and retrieval. A groundwater sampling pump collects groundwater through pumping. The two methods differ in operating procedures, application conditions, sampling efficiency, and their ability to collect samples from target groundwater layers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The appropriate method should be selected by considering sampling depth, well conditions, target water samples, and project technical requirements. Sampling quality should not be judged solely by equipment type.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Why Is the Well Purging Procedure Important in Groundwater Sampling Projects?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Well purging is an important step in groundwater monitoring and sampling. Its purpose, operating method, and completion criteria should be determined according to applicable technical specifications and project quality control requirements. Properly conducted well purging helps reduce the influence of factors such as stagnant water within the well on sampling results. Specific procedures should follow the requirements applicable to the project type, well conditions, and relevant technical standards.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. What Applications Are AML 918, AML 913, and AML 916 Designed For?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The AML 918 Groundwater Sampling Pump is primarily used for groundwater sampling. The AML 913 Groundwater Level Meter is used to measure groundwater levels, while the AML 916 Groundwater 6-Parameter Meter is used for on-site multi-parameter groundwater measurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These three products can be configured together according to project requirements. Their specific functions, parameters, and operating conditions should be confirmed against the official product documentation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. How Should Groundwater Sampling Equipment Be Selected?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Equipment selection should take into account groundwater well depth, target water layers, sampling tasks, well purging requirements, on-site monitoring parameters, data recording needs, and the technical specifications applicable to the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For government-commissioned projects or projects with stringent quality control requirements, it is advisable to communicate with the equipment supplier in advance and verify the relevant technical documentation before purchasing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. How Long Does It Take to Deliver Groundwater Sampling Equipment?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The delivery lead time generally depends on the product model, inventory availability, order quantity, configuration requirements, and production schedule. In this case, the standard delivery lead time for the relevant equipment was approximately three to four weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For customers working toward a fixed project mobilization date, it is advisable to discuss procurement plans in advance so that the actual delivery schedule can be confirmed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. How Can I Inquire About a Groundwater Sampling System and Equipment Configuration?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If you represent a third-party testing institution, environmental monitoring organization, or project contractor and need to purchase groundwater sampling pumps, groundwater level meters, groundwater multi-parameter meters, or related equipment, you can contact AIMOLI (Hebei) Technology Co., Ltd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Providing details such as the number of wells, well depth, sampling requirements, on-site monitoring parameters, applicable technical specifications, and expected delivery date in advance can help facilitate equipment selection and solution discussions tailored to your project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7. Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In this groundwater sampling project for a third-party testing center in Henan, the procurement process progressed from the initial holiday inquiry to the on-site inspection, contract signing, and equipment dispatch. Both parties actively coordinated around the project requirements and delivery schedule, helping bring the procurement process to completion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AIMOLI sincerely thanks Mr. Ma and his team for their trust and recognition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AIMOLI (Hebei) Technology Co., Ltd. continues to focus on application needs related to groundwater sampling, groundwater level measurement, and on-site multi-parameter monitoring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Third-party testing institutions and other organizations looking to purchase <a href=\"https:\/\/www.aimoli2016.cn\/?p=50\">groundwater sampling systems<\/a>, select suitable equipment, or develop project-specific equipment configurations are welcome to contact AIMOLI to discuss their requirements and potential equipment solutions.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" src=\"http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25-576x1024.png\" alt=\"AIMOLI\" class=\"wp-image-185\" srcset=\"http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25-576x1024.png 576w, http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25-169x300.png 169w, http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25-768x1365.png 768w, http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25-864x1536.png 864w, http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25.png 941w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma&#8217;s organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-689","post","type-post","status-publish","format-standard","hentry","category-blog"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma&#039;s organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Qingguo.Song\"\/>\n\t<link rel=\"canonical\" href=\"http:\/\/www.aimoli2016.cn\/?p=689\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Qingguo.Song Blog | AIMOLI Groundwater and Well Sampling\/Monitoring,Equipment,Microplastic Analysis\/detection\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Groundwater Sampling System Case Study | Qingguo.Song Blog\" \/>\n\t\t<meta property=\"og:description\" content=\"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma&#039;s organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the\" \/>\n\t\t<meta property=\"og:url\" content=\"http:\/\/www.aimoli2016.cn\/?p=689\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-22T08:49:35+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-22T08:49:37+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Groundwater Sampling System Case Study | Qingguo.Song Blog\" \/>\n\t\t<meta name=\"twitter:description\" content=\"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma&#039;s organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#blogposting\",\"name\":\"Groundwater Sampling System Case Study | Qingguo.Song Blog\",\"headline\":\"Groundwater Sampling System Case Study\",\"author\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?author=1#author\"},\"publisher\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"http:\\\/\\\/www.aimoli2016.cn\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-2026\\u5e746\\u670824\\u65e5-22_16_25.png\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689\\\/#articleImage\",\"width\":941,\"height\":1672,\"caption\":\"AIMOLI\"},\"datePublished\":\"2026-10-22T16:49:35+08:00\",\"dateModified\":\"2026-10-22T16:49:37+08:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#webpage\"},\"isPartOf\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#webpage\"},\"articleSection\":\"Blog\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\\\/\\\/www.aimoli2016.cn\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?cat=1#listItem\",\"name\":\"Blog\"}},{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?cat=1#listItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?cat=1\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#listItem\",\"name\":\"Groundwater Sampling System Case Study\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#listItem\",\"position\":3,\"name\":\"Groundwater Sampling System Case Study\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?cat=1#listItem\",\"name\":\"Blog\"}}]},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#organization\",\"name\":\"Qingguo.Song Blog\",\"description\":\"AIMOLI Groundwater and Well Sampling\\\/Monitoring,Equipment,Microplastic Analysis\\\/detection\",\"url\":\"http:\\\/\\\/www.aimoli2016.cn\\\/\"},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?author=1#author\",\"url\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?author=1\",\"name\":\"Qingguo.Song\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36c1c527ac842b6790601f0083939bdcda187bbe9346c88f3ebe2ac6547e5783?s=96&d=identicon&r=g\",\"width\":96,\"height\":96,\"caption\":\"Qingguo.Song\"}},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#webpage\",\"url\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689\",\"name\":\"Groundwater Sampling System Case Study | Qingguo.Song Blog\",\"description\":\"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma's organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#website\"},\"breadcrumb\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?p=689#breadcrumblist\"},\"author\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?author=1#author\"},\"creator\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/?author=1#author\"},\"datePublished\":\"2026-10-22T16:49:35+08:00\",\"dateModified\":\"2026-10-22T16:49:37+08:00\"},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#website\",\"url\":\"http:\\\/\\\/www.aimoli2016.cn\\\/\",\"name\":\"Qingguo.Song Blog\",\"description\":\"AIMOLI Groundwater and Well Sampling\\\/Monitoring,Equipment,Microplastic Analysis\\\/detection\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"http:\\\/\\\/www.aimoli2016.cn\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Groundwater Sampling System Case Study | Qingguo.Song Blog","description":"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma's organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the","canonical_url":"http:\/\/www.aimoli2016.cn\/?p=689","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"http:\/\/www.aimoli2016.cn\/?p=689#blogposting","name":"Groundwater Sampling System Case Study | Qingguo.Song Blog","headline":"Groundwater Sampling System Case Study","author":{"@id":"http:\/\/www.aimoli2016.cn\/?author=1#author"},"publisher":{"@id":"http:\/\/www.aimoli2016.cn\/#organization"},"image":{"@type":"ImageObject","url":"http:\/\/www.aimoli2016.cn\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-2026\u5e746\u670824\u65e5-22_16_25.png","@id":"http:\/\/www.aimoli2016.cn\/?p=689\/#articleImage","width":941,"height":1672,"caption":"AIMOLI"},"datePublished":"2026-10-22T16:49:35+08:00","dateModified":"2026-10-22T16:49:37+08:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"http:\/\/www.aimoli2016.cn\/?p=689#webpage"},"isPartOf":{"@id":"http:\/\/www.aimoli2016.cn\/?p=689#webpage"},"articleSection":"Blog"},{"@type":"BreadcrumbList","@id":"http:\/\/www.aimoli2016.cn\/?p=689#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/#listItem","position":1,"name":"Home","item":"http:\/\/www.aimoli2016.cn\/","nextItem":{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/?cat=1#listItem","name":"Blog"}},{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/?cat=1#listItem","position":2,"name":"Blog","item":"http:\/\/www.aimoli2016.cn\/?cat=1","nextItem":{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/?p=689#listItem","name":"Groundwater Sampling System Case Study"},"previousItem":{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/?p=689#listItem","position":3,"name":"Groundwater Sampling System Case Study","previousItem":{"@type":"ListItem","@id":"http:\/\/www.aimoli2016.cn\/?cat=1#listItem","name":"Blog"}}]},{"@type":"Organization","@id":"http:\/\/www.aimoli2016.cn\/#organization","name":"Qingguo.Song Blog","description":"AIMOLI Groundwater and Well Sampling\/Monitoring,Equipment,Microplastic Analysis\/detection","url":"http:\/\/www.aimoli2016.cn\/"},{"@type":"Person","@id":"http:\/\/www.aimoli2016.cn\/?author=1#author","url":"http:\/\/www.aimoli2016.cn\/?author=1","name":"Qingguo.Song","image":{"@type":"ImageObject","@id":"http:\/\/www.aimoli2016.cn\/?p=689#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/36c1c527ac842b6790601f0083939bdcda187bbe9346c88f3ebe2ac6547e5783?s=96&d=identicon&r=g","width":96,"height":96,"caption":"Qingguo.Song"}},{"@type":"WebPage","@id":"http:\/\/www.aimoli2016.cn\/?p=689#webpage","url":"http:\/\/www.aimoli2016.cn\/?p=689","name":"Groundwater Sampling System Case Study | Qingguo.Song Blog","description":"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma's organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the","inLanguage":"en-US","isPartOf":{"@id":"http:\/\/www.aimoli2016.cn\/#website"},"breadcrumb":{"@id":"http:\/\/www.aimoli2016.cn\/?p=689#breadcrumblist"},"author":{"@id":"http:\/\/www.aimoli2016.cn\/?author=1#author"},"creator":{"@id":"http:\/\/www.aimoli2016.cn\/?author=1#author"},"datePublished":"2026-10-22T16:49:35+08:00","dateModified":"2026-10-22T16:49:37+08:00"},{"@type":"WebSite","@id":"http:\/\/www.aimoli2016.cn\/#website","url":"http:\/\/www.aimoli2016.cn\/","name":"Qingguo.Song Blog","description":"AIMOLI Groundwater and Well Sampling\/Monitoring,Equipment,Microplastic Analysis\/detection","inLanguage":"en-US","publisher":{"@id":"http:\/\/www.aimoli2016.cn\/#organization"}}]},"og:locale":"en_US","og:site_name":"Qingguo.Song Blog | AIMOLI Groundwater and Well Sampling\/Monitoring,Equipment,Microplastic Analysis\/detection","og:type":"article","og:title":"Groundwater Sampling System Case Study | Qingguo.Song Blog","og:description":"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma's organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the","og:url":"http:\/\/www.aimoli2016.cn\/?p=689","article:published_time":"2026-10-22T08:49:35+00:00","article:modified_time":"2026-10-22T08:49:37+00:00","twitter:card":"summary_large_image","twitter:title":"Groundwater Sampling System Case Study | Qingguo.Song Blog","twitter:description":"AIMOLI Helps a Third-Party Testing Center in Henan Configure Equipment for a 20-Well Sampling Project During the National Day holiday, AIMOLI (Hebei) Technology Co., Ltd. received an equipment inquiry from Mr. Ma in Henan. Mr. Ma's organization is a third-party testing center undertaking a groundwater well purging and sampling project involving 20 wells. Because the"},"aioseo_meta_data":{"post_id":"689","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-10-22 08:49:37","updated":"2026-10-22 08:49:37","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"http:\/\/www.aimoli2016.cn\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"http:\/\/www.aimoli2016.cn\/?cat=1\" title=\"Blog\">Blog<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tGroundwater Sampling System Case Study\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"http:\/\/www.aimoli2016.cn\/"},{"label":"Blog","link":"http:\/\/www.aimoli2016.cn\/?cat=1"},{"label":"Groundwater Sampling System Case Study","link":"http:\/\/www.aimoli2016.cn\/?p=689"}],"_links":{"self":[{"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/posts\/689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=689"}],"version-history":[{"count":1,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/posts\/689\/revisions"}],"predecessor-version":[{"id":690,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=\/wp\/v2\/posts\/689\/revisions\/690"}],"wp:attachment":[{"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=689"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.aimoli2016.cn\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}